Customization: | Available |
---|---|
Mask Application: | Security Mask |
Material: | Cotton Yarn |
Still deciding? Get samples of US$ 5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
SPECIFICATIONS:
Model Number | P811D |
Standard | EN149:2001+A1:2009 |
Filter Rating | FFP1 NRD |
Certification | CE |
Layer | 4plys, Double Punched cotton/2Plys Meltblown Filter/Double punched Cotton |
Head Strap | 7mm Polyester Band |
Nose Pad | PU |
NoseClip | Al Foil |
Valve | Welded Patented Valve |
Product Type | Anti Dust and other Particles |
Size | L |
Package | 10Pcs/Color Box, 24Box/Ctn |
Application | Construction, Food Processing, Food Safety, General Manufacturing, Heavy Infrastructure, Mining, Oil & Gas, Transportation |
1. OEM/ODM Service for Product and Package
2. Free Samples
3. We will reply to your inquiry in 24 hours.
4. After the goods are sent out, we will track the transportation of the goods throughout the process to ensure that you receive the goods in time.
5. After-sales service
1. Are you a manufacturer or trader?
We are a direct manufacturer
2. What is your price?
Since there is a large variety of our models. please suggest your quantity and we will send you the best quotation.
3. Do you have a minimum order quantity?
Yes, we require a minimum order quantity for all international orders. If you want to resell but the quantity is small, you can contact us directly to get more details.
4. What Certifications do you have?
We have gotten ISO9001 Factory Certification and Various products have gotten certifications of CE EN149:2001, EN140:2009, AS/NZS 1716:2012, ASTM F2100-2004, ASTM2010 and GB2626-2006.
5. How to ensure quality?
We always have pre-production samples before mass production; We have multiple quality inspection links during the production process and fully inspect all products before packaging and final inspection before shipment.
6. How many days is your delivery time?
For samples, the delivery time is about 1 week.
For mass production, the delivery time is 20-30 days after receiving the deposit. Delivery time is effective when we receive your deposit and get your final approval for your product. We will try our best to meet your requirements.
7. What payment methods do you accept?
We accept T/T, L/C At sight, Western Union, or PayPal payment methods.
Usually 30% deposit is paid in advance and 70% of the balance is paid upon presentation of a copy of the bill of lading.
8. How about the shipping cost?
Shipping costs depend on the shipping method you choose. Express delivery is usually the fastest but also the most expensive way. Ocean shipping is the best solution for large quantities of goods. We can only give you accurate shipping costs if we know the details of quantity and weight.